On 9-26, the first HURT 100 trail maintenance group (the MMs) met in the dark, and the rain, at Jackass Ginger. We carried tools and backpacks at 6:10 am, across the raging Nuuanu Stream, up to the top of the switchbacks on Nuuanu Trail.Before

Aftre2 With Aaron’s hoes,rakes, and picks, we hacked out slide areas to widen the trail, raked and raked little rubbly areas, cut a few drains to let water flow off the trail, cleared a blocked waterfall on the trail to let the water run free, raked a BIG rubbly area that consisted of about a two foot deep layer of baseball sized rocks, cut in a few steps, and trimmed a few overhanging rubbish plants over the trail. After5

We finished about 11:30, feeling a little dirty and trashed, but very satisfied about our accomplishment. Wish we had had a few minutes to run back up and down the trail to enjoy our handy work, but that will have to wait until our next trip to the trail. Chances are we’ll have to go back and re-rake right before the race, but at least the trail will be a little safer during training for the 100.

Trail workers included: Mike M., Bozo, Carl Wooten, McAllaster,Cheryl and PJ.